Delaying Remediation? The Hidden Cost of Inaction for New Zealand Body Corporates

Weathertightness Crisis: A Slow-Burn Legacy


The iconic “leaky homes” crisis - impacting timber‑framed apartments and townhouses built between the late 1980s and early 2000s - is still unfolding. Though much focus has been on standalone houses, multi-unit complexes are just as affected.


The problem is enormous - estimates for remediation range from NZ$11 billion to NZ$53 billion. Local councils alone have already paid tens (if hundreds) of millions on claims and settlements.


Weathertightness defects expose Body Corporates to litigation, escalating insurance, and remediation costs. A key court case (Imperial Gardens) saw repair cost claims over NZ$40 million. Yet many remain under-funded, putting repairs on hold and increasing risks.

Damp buildings breed mould—compromising health, lowering property values, and complicating sales or financing.



Seismic Compliance: A Pressing, Legal Deadline


The Building (Earthquake-prone Building Deadlines and Other Matters) Amendment Bill extends remediation timelines by four years—but adds penalties up to NZ$150,000 per Body Corporate and NZ$50,000 per individual for non-compliance.


Auckland alone has ~1,700 structures deemed earthquake-prone. Nationwide, around 500 deadlines are expiring in the next four years.

Stronger structures require extensive retrofits, and for buildings up to 8 storeys, the seismic resilience element can still significantly bump overall construction costs.



Besides fines, failure to comply can render buildings unsellable, uninsurable, and legally exposed.



Side-by-Side Comparison

Issue Weathertightness Seismic
Damage Speed Gradual deterioration & hidden structural rot Sporadic deterioration but constant legal ticking clock
Legal Framework Claims via WHRS or civil suits Mandatory under 2017 Act, penalties established
Cost Drivers Extensive recladding, litigation, insulation Structural engineering, braces, strengthening work
Timeline Urgency Leads to declining health & value Time-bound deadlines with legal repercussions
Common Grounds Political inattention, reserve insufficiency Budget gaps, owner conflict over funding

The Penalty of Delay


  • Compound Financial Burden: Patching without full remediation wastes money. Repairs done too late often need redoing - or escalate into integrated structural fixes.
  • Community Trust Erodes: As defects linger, owner confidence drops. Insurance premiums climb, and governance becomes adversarial, not collaborative.
  • Legal & Insurance Fallout: For seismic non-compliance and weathertightness, insurers may refuse renewals. Courts increasingly rule against delayed or inadequate repairs.
  • Value Destruction: Buyers shy away from overdue Body Corporate work—leading to distressed sales or steeper discounts.



Why MOD Finance Changes the Equation


  • Act Now, Pay Over Time: Our specialised Body Corporate loans allow immediate access to funds - perfect for starting weathertightness remediation and seismic strengthening swiftly, avoiding compound delay costs.
  • Unified Project Cashflow: With complete funding, contracts proceed smoothly. Builders, engineers, and insurers can be engaged on schedule, reducing the risk of halts or contractor walk-offs.
  • Enhancing Compliance and Reputation: Demonstrating active remediation reassures insurers, regulators, and potential buyers that the Body Corporate is proactive—not reactive.
  • Long-Term Value Preservation: Loans enable projects that protect asset values, ensure legal compliance, and sustain owner confidence—all vital for healthy communities.



Final Take


Delay is a luxury Body Corporates can’t afford. Whether tackling leaky façades or reinforcing foundations, you’re choosing not just to spend - but to bear compounding risk: financially, legally, and reputationally.


If your Body Corporate is underfunded - or struggling to reach consensus - MOD Finance offers a solution that aligns timelines, stakeholders, and finances. Contact us for a no-obligation funding strategy that equips you for both weathertightness and seismic success.